Cat Tree Sourcing Guide: MOQ, Lead Time & FOB Pricing

MOQ, lead time and price: the three questions every buyer asks

This guide explains how the three biggest cost drivers work when you source cat trees from a factory in China — so you can plan stock, cash flow and pricing with fewer surprises.

1. MOQ (minimum order quantity)

MOQ is set by material efficiency, not by policy. A cat tree that uses a standard board size can run at lower MOQ; a fully custom design needs its own tooling and dies, which pushes MOQ up.

Order type Typical MOQ Why
Existing catalog model A few hundred units Standard boards, shared tooling
Colour / fabric change Frequently low No new tooling, only material swap
Custom OEM design Higher New dies, packaging and QC setup

2. Lead time

Plan for the whole chain, not just assembly:

  1. Sample approval and deposit: 1–2 weeks
  2. Material prep (board cutting, sisal, fabric): 1–2 weeks
  3. Production and assembly: 2–3 weeks
  4. QC, packing and loading: 3–5 days
  5. Sea freight to EU/US: 25–40 days

Typical ex-works production lead time is 25–35 days after deposit for repeat models.

3. FOB price and incoterms

Term You pay for Best when
EXW Goods at factory gate You have your own forwarder in Ningbo
FOB Ningbo Goods loaded on vessel Most common for container buyers
CIF Goods + freight + insurance to port You want freight handled
DDP Delivered, duty paid to your door Small first orders / Amazon sellers

How to compare quotes fairly

  • Normalise to the same incoterm and currency.
  • Ask for the material spec in writing (board type, sisal length, fabric).
  • Confirm whether tooling and packaging are one-off or per-order.

Ready to price a program? See our cat tree range and request an FOB quote.

What is the typical MOQ for wholesale cat trees?

Many models start from a few hundred units; custom OEM designs carry a higher MOQ because of new tooling and packaging setup.

What are the shipping terms for cat trees?

FOB Ningbo is most common. EXW, CIF and DDP are available on request depending on your logistics setup.

How long does production take?

Typically 25–35 days after deposit for repeat models, excluding sea freight of roughly 25–40 days.

Do you quote FOB or landed cost?

We quote FOB by default and can provide a delivered (DDP) estimate on request with your destination ZIP or postcode.

WeChat QR Code

Scan to add us on WeChat

gmtpet

Click to copy WeChat ID

Login Required

Please login to submit an inquiry.

If you don't have an account, please register first.